PANYNJ PATH Harrison Station

PANYNJ PATH Harrison Station

Location Harrison, NJ
Project Value $256 million
Client Dattner Architects

In 2003, the Town of Harrison adopted the Harrison Waterfront Redevelopment Plan with a goal to revitalize the existing industrial area with transit-oriented development that includes residential, retail and commercial uses. Part of the Plan was the replacement of the existing PATH Harrison Station, which was approaching the end of its useful life. The station replacement will meet the anticipated increase in ridership resulting from the development projects in the Town of Harrison, as well as an increased ridership on PATH. Additionally, their replacement will support future 10-car PATH operation on the Newark to World Trade Center PATH service line.

TCT prepared construction cost estimates during the design and contract documents phases based on the final contract drawings and specifications. The estimates were also prepared in accordance with the Port Authority’s “Construction Estimating Guide”. The BIM model was used, as required, to generate material quantity take-offs to support the cost estimate.

New York
Toscano Clements Taylor, LLC 1 Penn Plaza, Suite 4415
New York, NY 10119
917.388.3535 631.392.1399
Washington, DC
TCT Cost Consultants, LLC 1730 Pennsylvania Avenue NW, Suite 350
Washington, DC, 20006
202.315.8944 202.315.1915
New Jersey
Toscano Clements Taylor Cost Estimators, LLC 305 East High Street
Bound Brook, NJ 08805
732.627.0007 732.627.0017
Maryland
Toscano Clements Taylor, LLC 400 East Pratt Street, #807C
Baltimore, MD 21202
202.315.8944 202.315.1915
^