TCT provided cost estimating services for the University’s Master Plan, a 15-year road map for long-term campus projects. Building demolitions were separated into three categories: near-term building demolitions, framework plan building demolitions, and other potential building demolitions. Near-term building demolitions identified structures that needed to be replaced because they were either in poor condition, or underutilized sites, or both. It was anticipated that these buildings would be razed during the first five years of the plan.